Illinois Reuse Machineries and Industrial Equipment Newsboad   >   Illinois   >   St.Charles   >   30 first step bedside endoscope cleaning kits cygnus

30 first step bedside endoscope cleaning kits cygnus

BOX A 30 CYGNUS MEDICAL FIRST STEP BEDSIDE ENDOSCOPE PRECLEAN KITS EP-2
The first step in reprocessing
The first step in reprocessing a flexible endoscope is to
wipe down the insertion tube and suction up enzymatic
detergent/water through the working channels.
Simply open the pack, remove the hand pad and wipe down
the insertion tube, then discard the pad. Suction up the prediluted
enzymatic detergent until the pack is empty and
30 first step bedside endoscope cleaning kits cygnus 30 first step bedside endoscope cleaning kits cygnus 30 first step bedside endoscope cleaning kits cygnus